The schedule
Every item in the scope becomes an activity with a duration, something in front of it and a trade on it. Forward pass and backward pass, so you get real float and a real critical path — not a list of tasks in the order they were typed.
For estimators, and the people who then have to build it
NextSchedule reads the scope of work and the drawings in a tender package and hands back a sequenced schedule, trade by trade — with the work marked by others pulled out, and a check against the completion time the contract actually demands.
3 tenders, no card, nothing to cancel.
| Activity | Trade | Days | Start | Finish | Float |
|---|---|---|---|---|---|
| Award and mobilization | Prime contractor | 5 | 20 Apr | 24 Apr | 0 |
| Shoring and excavation | Earthworks | 12 | 27 Apr | 12 May | 0 |
| Dewatering set-up | Mechanical | 3 | 27 Apr | 29 Apr | 9 |
| Base slab formwork | Concrete | 6 | 13 May | 20 May | 0 |
| Base slab pour | Concrete | 1 | 21 May | 21 May | 0 |
| Conduit cast into slab | Electrical | 4 | 14 May | 19 May | 4 |
| Wetwell piping rough-in | Piping | 9 | 22 May | 3 Jun | 2 |
Printed on top of the real thing: This schedule was built from scope of work and tender documents only. No drawings were issued at time of schedule creation.
Every item in the scope becomes an activity with a duration, something in front of it and a trade on it. Forward pass and backward pass, so you get real float and a real critical path — not a list of tasks in the order they were typed.
Anything the documents hand to somebody else is pulled out and listed on its own, with the line it came from. You price what is actually yours, and you can show the owner why.
The documents say how many days you get. The schedule says how many days it takes. When those two disagree you find out while you are still pricing it, not at the pre-construction meeting.
One view per trade, with that trade's work and the handoffs either side of it. That is what you send a sub when you ask them to price their part.
Two charges, kept separate on purpose. You never pay for the job side of a job you did not win.
From $299/month · CAD
Banded by how many estimators you have, not by how many tenders they read. Price as many as you like. Bid them, win them, lose them — the price does not move.
$149/month · per live job
This is the half the superintendent uses: the daily screen, work packages with the tools and materials on them, the baseline, the narrative and progress from the field. It starts when the first payment clears and it stops the day you close the job.
Ticking we won it does not open anything. It raises the invoice and asks who the project manager is. The job side opens when the payment clears — and we tell you 28 days before any card is ever charged again.
All the bands and what is in themThat is the only test worth anything. 3 packages, no card on file, and the schedules you build stay readable whatever you decide afterwards.